February 01, 2004
Detour, boss, detour.
Beginning tomorrow, Octavia Boulevard is in full effect.
Construction will continue around the elevated Central Freeway; a new offramp will be built down past Zeitgeist on to surface-grade at Octavia.
Beginning tomorrow, Octavia Boulevard is in full effect.
Construction will continue around the elevated Central Freeway; a new offramp will be built down past Zeitgeist on to surface-grade at Octavia.
Sun | Mon | Tue | Wed | Thu | Fri | Sat |
---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | 5 | ||
6 | 7 | 8 | 9 | 10 | 11 | 12 |
13 | 14 | 15 | 16 | 17 | 18 | 19 |
20 | 21 | 22 | 23 | 24 | 25 | 26 |
27 | 28 |